management of large project and programme
Term Paper Brief
- A) Select ONE ONLY of the following projects â–ª The Channel Tunnel Rail Link (HS1) (NOT the Channel Tunnel Project)
- â–ª London Heathrow Terminal Five
- â–ª The 2012 London Olympics
- â–ª The Boston Central/Artery Tunnel (The “Big Digâ€) (Boston MA, USA)
- â–ª Thames Tideway Tunnel
- â–ª Crossrail
- â–ª High Speed Two (HS2)
- ▪ Three Gorges Dam (People’s Republic of China)
- â–ª Another large project or programme approved by the Module Leader.
- B) Briefly describe the project and demonstrate using available literature: the key challenges of the project/programme and its management noting in particular any aspect which has made the project/programme more difficult by the size/scale/complexity. (30% of marks)
- C) Analyse ONE ONLY of the following aspects of the project/programme (40% of marks):
- 1) Governance
- 2) Stakeholder Engagement
- 3) Risk Management
- 4) Benefits Realisation Management
- D) Discuss the findings from your analysis regarding the chosen project/programme and justify your proposals for how the aspects of the project or programme management analysed in C) could have been improved. (20% of marks)
- E) Presentation. (10% of marks)
In analysing and presenting your arguments, you are strongly advised to consult multiple sources, including industry and government publications and academic literature. You should aim at a minimum of descriptive material in favour of analytical text.
Please refer to the Course Guide for the generic Term Paper assessment criteria and requirements for presentation.
Length: 3,000 words
At least 10 references.
Attached ppt are provided to understand what the course is.